The medium-voltage switchgear must be documented with a CAE system according to IEC 60617.
Drawings to be provided: Circuit diagrams, terminal diagrams, schematic diagrams, front views, constructional data and a single-line diagram.
The complete design diagrams must be submitted for inspection and approval before start of manufacture and assembly. Switchgear manufacture may only be started on the basis of released diagrams.
The documentation must be submitted in printed form in A4 format and as pdf file. The final revision must be additionally supplied on data carriers in dxf / dwg format.
Operating instructions
Operating instructions concerning transport, installation, connection and commissioning, maintenance and disposal are part of the scope of supply of the switchgear.
Offer documentation
The following must be enclosed with the offer:
Order documentation
The following documents are part of the scope of supply:
Texts included in circuit diagrams, front views, etc. will be in English as standard. Labeling in other languages and customized headers are possible.